PRESSURE TEST CHECK LIST |
- Check that all componentsare installed and in correct location
- Manual open and solenoid valves etc as required. Use coil magnets on solenoids
- Check gauges are calibrated, using commissioning gauge set.
- Check gauges and hoses for leaks prior to testing
- Have client representative witness leak test and sign off.
|
| |
|
|
| |
|
| |
|
EVACUATION CHECK LIST |
- Remove nitrogen from system.
- Add any oil, filters etc as required prior to evacuation.
- Use appropriate vacuum pump for the application.New installation use commissioning vacuum pump.
- Note: fit check valve to gauge hose on vac pump for inital vacuum or if leaving overnight.
REMEMBER REMOVE CHECK VALVE TO OBTAIN ULTIMATE VACUUM.
- Measure Vacuum with Vacustat.New system 500 Micron or lower.
- Have client representative wirness vacuum test and sign off.
|
| |
|
| |
|
|
|
|